CONSTRUCTION IS OUR FORTE.

Image description

COMPLETED PROJECTS

This is a representative sampling of the types of projects that we have recently completed.

Contact us for a comprehensive list of projects.


Image description
Image description

THE NEW VA HOSPITAL @ LAKE NONA'S 'MEDICAL CITY'

Orlando Veterans Administration Medical Center

U.S. Department of Veterans Affairs

 

FORTE YOUNG INC. was one of the small business partners of Brasfield & Gorrie for construction of the new VA Medical Center. This state-of-the art medical complex in southeast Orange County serves and honors approximately 113,000 local veterans with comprehensive modern healthcare. Overall, the project is 1.1 million SF and included construction of more than a dozen buildings on the VA's 65 acre campus.  Buildings include a four-story 134-inpatient bed hospital, four-story clinic, 120-bed lakeside nursing home for community living, 60-bed rehabilitation / domiciliary center, a dining canteen that seats 500 people and two seven-story parking garages.

Project Type

HOSPITAL

Location

Orlando, Florida

Size

1.1 Million SF

Delivery Method

CM-at-Risk

Image description

THE INSTITUTE OF INTERNAL AUDITORS | IIA


23,000 SF interior build-out in a Class 'A' office building - Northpoint II - located in Maitland. FORTE YOUNG INC. was retained as Owner's Representative/Project Manger. FORTE YOUNG INC. was responsible for managing all aspects of the project including design, permitting, procurement, contractor selection, construction, FF&E and tenant move-in.

Project Type

TI - TENANT IMPROVEMENT

Location

Maitland, Florida

Size

23,000 SF

Delivery Method

Owner's Representative/Project Manager

Image description

ELECTRONIC ARTS

EA TIBURON/EA GAMES/EA SPORTS


Interior renovation to the core areas of all six floors of this Class 'A' office building located in Maitland Summit. New finishes included granite countertops, painting, flooring and acoustical ceilings. Upgrades to the plumbing system included new water coolers and new dual flush toilets saving thousands of gallons of water annually. Work was completed in phases with no impact to the 24/7 operations of longtime tenant EA Tiburon.

Project Type

OFFICE/INTERIORS

Location

Orlando (Maitland), Florida

Size

128,000 SF

Delivery Method

General Contractor

Image description

NEMOURS CHILDREN'S HOSPITAL @ LAKE NONA'S 'MEDICAL CITY'


New seven story 633,000 SF state-of-the art children's hospital consisting of 400,000 SF for 95 private patient rooms, operating rooms, imaging department with MRI, food service facility, laboratory and pharmacy, and a 200,000 SF clinic with 85 exam rooms, educational center, conference facilities, and 225 seat auditorium. Complete site improvements on a 60 acre greenfield site included an onsite central energy plant and 900 car parking garage. The design theme was a 'Hospital in a Garden' and the building incorporates a pair of roof gardens with native Florida plant materials.

Project Type

HOSPITAL

Location

Orlando, Florida

Size

633,000 SF

Delivery Method

CM-at-Risk

Image description

DR. PHILLIPS CENTER FOR THE PERFORMING ARTS ('DPC')


New state-of-the-art assembly occupancy facility that includes three (3) separate theatres. The project was built in two phases: Stage I and Stage II. Stage I includes a 2,700-seat Broadway stage (Walt Disney Theatre), 300-seat community stage (Alexis & Jim Pugh Theatre), educational spaces, administration/office spaces and complete site improvements with an expansive front lawn used for community gathering and outdoor performances. Stage II is a 128,000 SF structure that was tied into the North end of the existing facility. It includes The Green Room - a large rehearsal room and performance space - full kitchen facilities, continued lobby space and a 1,700-seat acoustic theatre (Steinmetz Hall).

Project Type

ASSEMBLY OCCUPANCY

Location

Orlando, Florida

Size

330,000 SF

Delivery Method

CM-at-Risk


Image description

ORANGE COUNTY UTILITES - ORLANDO

WESTERN REGIONAL WATER DIVISION


Infrastructure upgrades at an existing water treatment plant.

Project Type

INFRASTRUCTURE UPGRADES

Location

Orlando, Florida

Size

5 acres

Delivery Method

General Contractor


Image description

ROYAL ESTATES


DESIGN/BUILD: Design, permitting and construction of a new recreation area including tot lot with playground equipment and fence.



Project Type

AMENITIES PROJECT

Location

Windermere, Florida

Size

3 acres

Delivery Method

General Contractor

Image description

WINDERMERE TERRACE


DESIGN/BUILD: Design, permitting and construction of this pool cabana complete with an access control system and pool furniture.

Project Type

AMENITIES PROJECT

Location

Windermere, Florida

Size

3 acres

Delivery Method

General Contractor

Image description

LEGACY PARK - PHASE III


DESIGN/BUILD: Design, permitting and construction of a new mail kiosk and new tot lot including playground equipment and fence.

Project Type

AMENITIES PROJECT

Location

Casselberry, Florida

Size

1 acre

Delivery Method

General Contractor

Image description

PASCO ELEMENTARY SCHOOL 'R'


New elementary school campus including a new 165,000 SF two story tilt-wall building. Complete site improvements were included.

Project Type

K-12 SCHOOLS

Location

Dade City, Florida

Size

165,000 SF

Delivery Method

CM-at-Risk

Image description

INDIAN RIVER STATE COLLEGE

THE BROWN CENTER FOR INNOVATION AND ENTREPRENEURSHIP | ABC Eagle Award Winner


55,000 SF new state-of-the-art, ecofriendly facility built to LEED Silver specifications. The building is 30% powered by sun and wind. Complete site improvements were included.


Project Type

HIGHER EDUCATION

Location

Ft. Pierce, Florida

Size

55,000 SF

Delivery Method

CM-at-Risk

Image description

OCPS | HACKNEY PRAIRIE ELEMENTARY SCHOOL

 

New elementary school campus including a new 98,797 SF two story tilt-wall building to house classrooms. Complete site improvements including parking lots, ball fields, playgrounds and landscaping & irrigation. Off-site improvements included underground utility work and extensions to Hackney Prairie Road and Timber Ridge Trail.


Project Type

K-12 SCHOOLS

Location

Orlando, Florida

Size

98,797 SF

Delivery Method

CM-at-Risk


Image description

OCPS | CYPRESS SPRINGS ELEMENTARY SCHOOL COMPREHENSIVE PROJECT

 

33,750 SF comprehensive renovation to the existing elementary school campus consisting of four (4) existing buildings and construction of a new 76,546 SF two story tilt-wall building to house new classrooms. Life safety upgrades were included throughout the renovation including new MEP systems.  Complete site improvements included underground utilities, parking lots, ball fields, playgrounds and landscaping & irrigation. Off-site underground utility work was also included.

 

 

Project Type

K-12 SCHOOLS

Location

Orlando, Florida

Size

110,296 SF

Delivery Method

CM-at-Risk


Image description

NATIONAL GYPSUM COMPANY

REGENCY WAREHOUSE BUILDINGS 1 AND 2


Demolition and reconstruction of the parking lots at two industrial buildings. Asphalt overlay, installation of bollards, reconstruction of swales and drainage, restriping and signage included. This project was completed in multiple phases as to not disturb the continuous operations of semi trucks.

Project Type

INFRASTRUCTURE UPGRADES

Location

Orlando, Florida

Size

60,000 SF

Delivery Method

General Contractor

Image description

LAKE ORANGE DRIVE - LIBERTY PARK AT AIPO


Asphalt overlay, restriping and signage included to this existing roadway located in Liberty Business Park. This project was phased as to not impact the high volume of traffic in this busy industrial park.

Project Type

INFRASTRUCTURE UPGRADES

Location

Orlando, Florida

Size

175,000 SF

Delivery Method

General Contractor

Image description

PHILLIPS LANDING @ DR. PHILLIPS


Work to reduce trip hazards in this upscale, gated community in Southwest Orlando. Demolition of existing concrete sidewalks, demolition of select tree roots and pour back new concrete slabs. The work was completed in phases broken down by three separate neighborhoods within the community.

Project Type

INFRASTRUCTURE UPGRADES

Location

Orlando, Florida

Size

21,000 SF

Delivery Method

General Contractor

Image description

KONE


Exterior pressure washing, painting and waterproofing of multiple industrial buildings located throughout Orlando, including one building that houses the operations of tenant, KONE Elevators & Escalators. Work was completed after hours and on weekends as to not disturb the 24/7 operations of multiple tenants.

Project Type

INFRASTRUCTURE UPGRADES

Location

Orlando, Florida

Size

110,000 SF

Delivery Method

General Contractor


c o n s t r u c t i o n  i s  o u r  FORTE.